Construction specifications for a wastewater treatment plant in Lucena del Puerto

This project involved providing the wastewater treatment plant with the capacity to treat water from 9,600 equivalent persons. The treated water had to have the quality necessary for it to be able to be discharged in a sensitive area, namely: BOD5 < 25 mg/l; SS < 35 mg/l; NTK < 15 mg/l and P < 2 mg/l. 1,920 m3 are now treated here each day, with an average hourly flow rate of 80 m3/h, a peak biological treatment flow rate of 160.88 m3/h and a maximum pre-treatment design flow rate of 480 m3/h.

2019
Huelva, Spain