Go back
Clifton Marsh landfill
Waste management services at Clifton Marsh Landfill Site
- Client: SITA Suez UK
- Date: 2000 - ongoing
- Location: Clifton Marsh, United Kingdom
- Sector: Water and the Environment
- Subsector: Waste Management
Go back
Clifton Marsh landfill
Clifton Marsh Landfill required a comprehensive approach to waste management services, including the design and supervision of construction materials, groundwater dewatering, and installation of landfill systems. The site presented challenges such as the need for a 17 m deep Bentonite cut-off wall, effective groundwater management, and the integration of environmental risk assessments into the design process. Ensuring compliance with regulatory requirements and maintaining the integrity of the landfill’s infrastructure were critical aspects of the project.
Ayesa was appointed to provide a range of waste management services at Clifton Marsh Landfill. Our role included:
Additionally, our team provided expertise in:
The site is now 90% capped, with all leachate and gas collection systems designed by our team, ensuring long-term environmental safety and compliance.
Ayesa’s comprehensive approach to the Clifton Marsh Landfill project ensured that all aspects of the landfill’s infrastructure were designed and implemented to the highest standards. Our expertise in risk-based design, environmental monitoring, and construction supervision provided robust solutions that addressed the site’s unique challenges. The successful installation of the Bentonite cut-off wall, effective groundwater management systems, and carefully selected capping materials have significantly enhanced the landfill’s operational efficiency and environmental protection measures.
Our goal is to provide you with the best services for your needs