Security

CDP University Miguel Hernandez

CDP University Miguel Hernandez

Elche and Sant Joan d'Alacant , Spain

To improve the physical infrastructure of the rooms designed to house the systems equipment at the University Miguel Hernández, they decided to build a new data center for it main campus in Elche and a backup data center to the previous one in Sant Joan d’Alacant.

In Ayesa we have developed the necessary engineering services for the preparation of relevant construction projects, and physical execution of his projects, and the systems engineering management.

Basically, the project includes the project and implementation of data processing center with a structure of stone wool panel in horizontal and vertical walls, including ancillary facilities redundant air conditioning, electricity, fire protection and alarm systems.

In Ayesa we have developed the necessary engineering services for the preparation of relevant construction projects, construction itself and the works supervisison.

Basically, the project includes the design and execution of data processing center with panel framed rock wool horizontal and vertical walls, ancillary facilities including redundant HVAC, electricity, fire protection and alarm systems.

Characteristics of the two facilities:

  • Area: 140 square meters the CPD principal and 95 the backup.
  • Structure of rock wool panel walls, floor and ceiling RF 120, in compliance with standard EN 1047 / 2.
  • Fire detection system with technology early cloud chamber.
  • System water mist extinguishing systems.
  • Air conditioning units with precision: 6 of 51.3 kw in the CPD Home and 3 of 45 kw in CPD backup.
  • Uninterruptible Power Supply with 2 units of 300 KVA and 80 KVA the CPD Backup.
  • Generator.
  • Central Scada system with remote access.
  • Send alarm messages via SMS. 
Location
Spain

News

Ayesa to use AI to run and monitor a pilot project involving photovoltaic modules on buildings
28/05/2021

Ayesa to use AI to run and monitor a pilot project involving photovoltaic modules on buildings

Ayesa and Entelgy Innotec Security sign an agreement to lead the industrial cybersecurity sector
18/05/2021

Ayesa and Entelgy Innotec Security sign an agreement to lead the industrial cybersecurity sector

Ayesa achieves the best results in its history after experiencing 4.3% growth during a year defined by COVID-19
26/04/2021

Ayesa achieves the best results in its history after experiencing 4.3% growth during a year defined by COVID-19

Ayesa participates in NextGenerationEU proposals seeking more than 300 million euros in funding
22/03/2021

Ayesa participates in NextGenerationEU proposals seeking more than 300 million euros in funding

Ayesa set to end the year of Covid with 4% organic growth in terms of its core business
08/01/2021

Ayesa set to end the year of Covid with 4% organic growth in terms of its core business

Ayesa creates an innovation lab for SAP-based IT solutions
08/01/2021

Ayesa creates an innovation lab for SAP-based IT solutions