Go back
INTERCONEXION MAD-4
Data Processing Centre
- Promoter: Interxion
- Date: 2022-2023
- Location: Madrid (Spain)
- Service: Construction consultancy and PMO
- Subservice: BIM Managemen
Go back
INTERCONEXION MAD-4
With 29,460 square meters and 6 floors, the INTERXION MAD4 data processing center is the largest in the capital, with a capacity of 34 MW of power and the capacity to store 140,000 servers.
The work has a budget of 230 millions.
Ayesa collaborates in the generation of the As-Built model of the diesel installations that are used to cool the servers in the case of a failure.
Our goal is to provide you with the best services for your needs