Technical assistance for managing expropriations on the site of the Gecama wind farm and transmission infrastructure

This project saw us provide technical assistance services for the expropriations necessary to build the Gecama wind farm, which has an installed capacity of 300 MW, as well as for its transmission infrastructure. Particularly noteworthy is the 400 kV high-voltage power line, which affects around 1100 properties.

2020/2021
Cuenca and Albacete, Spain