Projects

Construction specifications for improving the new course of the River Turia

This project aimed to introduce safety measures to reduce the risk of flooding in Valencia and Greater Valencia. A rainfall analysis was carried out, which took into account PMP and DANA (isolated depression at high level) events, in addition to a two-dimensional hydraulic model of the course. Once the river channel’s capacity had been estimated, measures to enhance and increase it were put forward. A survey report of the Vilamarxant dam on the river was also carried out.

2005
Valencia, Spain