string(1) "1"

Torija Data Center

Data Processing Center

  • Scope: Ayesa Ingeniería and ACT
  • Location: Guadalajara (Spain)
  • Area site: 41.539 sqm
  • Area building: 16.577 sqm
  • Service: Construction consultancy and PMO
  • Subservice: BIM Management / Technology and Data Centers
  • Challenge
  • Our work

Challenge

The project includes two buildings for Data Processing Centres, each DC consisting of a service building and a module with two IT rooms on the same floor (approx. 1,400 m²) and an electrical room.

Our work

Functional requirements:

  • Connections between the modules and service buildings.
  • Accessibility to IT, power supply and cooling equipment.
  • Specific study of the cooling of the IT rooms using Computational Fluid Dynamics (CFD) analysis comprising a modelling of the morphology of the room and progressive calculations.
  • Each building will contemplate the future extension of a module with two IT
    rooms of the same surface area, in addition to an electrical room.
  • TIER III certification by the Uptime Institute, without prejudice to the fact that the design incorporates TIER IV functionalities.

We support your projects

Our goal is to provide you with the best services for your needs

Making it happen