IM MAD-1 Data Center

Data Processing Center

  • Client: MADIC
  • Scope: Quark
  • Area: 22.000 sqm | 79 MW – All phasess
  • LocationMadrid (Spain)
  • Service: Construction consultancy and PMO
  • Subservice: BIM Management / Technology and Data Centers
  • Challenge
  • Our work

Challenge

Iron Mountain's MAD-1 data center in San Fernando de Henares, Madrid, is a strategic expansion into the Spanish market.

The campus, acquired from XData Properties, encompasses 60,000 m² and is being developed in phases.

The first phase includes a 4,000 m² facility with 3 MW of IT power. Future phases aim to increase capacity to 22,000 m² and 79 MW, catering to hyperscale and enterprise clients.

The campus is powered entirely by renewable energy and is designed with a Power Usage Effectiveness (PUE) of less than 1.4, reflecting Iron Mountain's commitment to sustainability and operational efficiency.

Our work

Ayesa is developing BIM Modeling for construction documents and the As-Built model for the facility's diesel installations, ensuring efficient cooling systems and operational reliability in case of power failures.