Ayesa is set to spearhead the tendering and procurement of construction works, enhancing the overall effectiveness of this significant flood scheme through a series of strategic advantages:
Expertise and Experience: With extensive experience in delivering in flood defense projects, Ayesa expertly navigates the technical and regulatory challenges of the project, ensuring adept handling from start to finish.
Technical Proficiency: Our capabilities in hydraulic modeling and flood risk assessments are vital for selecting the right contractors and ensuring the successful deployment of flood defense strategies.
Efficiency in Tendering: Our in-depth knowledge of the project’s specifics streamlines the tendering process, making it both transparent and competitive. This not only benefits the client but also ensures fairness for all contractors involved.
Quality Assurance: Ayesa implements stringent quality control measures throughout the construction phase to ensure that all flood defense structures meet the highest standards of quality and durability.
Optimised Design Implementation: Transitioning from planning to execution, Ayesa maintains consistent involvement to ensure that the flood defense mechanisms are implemented precisely as designed, optimizing functionality and effectiveness.
These strategic approaches guarantee enhanced outcomes for the flood scheme, ensuring robust flood defense solutions that are both effective and sustainable.
Key statistics Population Served: 14,000 residents
Flood Defenses: flood walls and embankments along both banks of the Avoca River
Protection for:
637 residential Properties
141 commercial properties
River Modifications: Dredging of the Avoca River, debris and gravel traps installation, and strengthening of quay walls and Arklow Bridge
Public Realm Enhancements: New urban spaces, footpaths, parking spaces, amenity areas, and lighting along River Walk and South Quay
Arklow Bridge: Underpinning, lowering of bridge floor, and remedial works to masonry
Utilities and Traffic Management: Road reconstruction, traffic calming measures, sewer interconnector for Arklow Wastewater Treatment Plant, and utility diversions
Environmental and Community Considerations:
Roosting Platforms: Installation of bird roosting platforms upstream of Arklow Bridge