The drafting of the project for the construction of the El Bayadh Wastewater Treatment Plant began with the drafting of a successful bid for Isolux.
The bid was drafted in 2009, and after the awarding of the tender and signature [of the contract] between the construction joint venture and the Office National de L`Assainissement (National Sanitation Board), the construction project was drafted between 2011 and 2012.
The object of the Ayesa contract was the development of the construction project as a basic document for the approval of all the necessary procedures, and that simultaneously served as the basis for the execution of the project, searching for easy-to-apply solutions. 
The works consisted in the preparation and drafting of the project for the construction of the El Bayadh Wastewater Treatment Station in Algeria, with 123,000 inhabitants and a design flow of 19,700 m3/day.
The project includes the design of all the civil works, equipment and facilities necessary for the proper functioning and operation of the WWTP.

  • Water line: pretreatment. Biological reactor based on an activated sludge system with prolonged aeration.
  • Sludge line: thickening of sludge by means of gravity thickener and dehydration by band filters.
  • The project also includes the different auxiliary buildings.

News

Ayesa comes top in the VII Awards for the Best Practices  in Sustainable Mobility
02/10/2019

Ayesa comes top in the VII Awards for the Best Practices in Sustainable Mobility

Ayesa to design the Jubail II desalination plant in Saudi Arabia for SEPCOIII
30/09/2019

Ayesa to design the Jubail II desalination plant in Saudi Arabia for SEPCOIII

CEO: ‘Andalusia needs a portfolio of major investment projects to compete at an international level’
23/09/2019

CEO: ‘Andalusia needs a portfolio of major investment projects to compete at an international level’

Ayesa participates in Bogotá’s most important environmental project to date to clean its river
28/06/2019

Ayesa participates in Bogotá’s most important environmental project to date to clean its river

Ayesa in 2018: 1.5% growth, 274 million euros in revenue and 24 million euros in EBITDA
13/05/2019

Ayesa in 2018: 1.5% growth, 274 million euros in revenue and 24 million euros in EBITDA

New edition of INGENIO, our corporate magazine
15/03/2019

New edition of INGENIO, our corporate magazine