Environmental Impact Study for the Modernisation Project of the Guadalquivir Rice Area (Seville)

The aim of this project was to reduce the use of the rice area within the General Basin Regulation System by way of optimising water resources; to increase the guarantee of supply during droughts; and to improve the water quality, making it independent from the salinity of the Guadalquivir River as far as possible, something which would immediately lead to an increase in production. 

Thus, the purpose of the project was to design the necessary infrastructure to supply the right and left banks of the Guadalquivir River by way of gravity.

This project involved drafting:

  • An environmental impact study
  • An impact study for the areas belonging to the Natura 2000 network
  • A study on endangered flora and fauna

Amongst the unique features of this project were the distribution of habitats and species of interest at a European level, the choice of a construction system using siphons so as not to interfere with the courses of the Guadalquivir River and a passage system for fish.

The aim of the study was to comply with the second phase of the European Directive on environmental assessment and management and with the Noise Act, which establish that from 2012 onwards, those responsible for road infrastructures with an annual average traffic volume of more than 3,000,000 vehicles must create strategic noise maps.

 

Location
Spain

News

Ayesa comes top in the VII Awards for the Best Practices  in Sustainable Mobility
02/10/2019

Ayesa comes top in the VII Awards for the Best Practices in Sustainable Mobility

Ayesa to design the Jubail II desalination plant in Saudi Arabia for SEPCOIII
30/09/2019

Ayesa to design the Jubail II desalination plant in Saudi Arabia for SEPCOIII

CEO: ‘Andalusia needs a portfolio of major investment projects to compete at an international level’
23/09/2019

CEO: ‘Andalusia needs a portfolio of major investment projects to compete at an international level’

Ayesa participates in Bogotá’s most important environmental project to date to clean its river
28/06/2019

Ayesa participates in Bogotá’s most important environmental project to date to clean its river

Ayesa in 2018: 1.5% growth, 274 million euros in revenue and 24 million euros in EBITDA
13/05/2019

Ayesa in 2018: 1.5% growth, 274 million euros in revenue and 24 million euros in EBITDA

New edition of INGENIO, our corporate magazine
15/03/2019

New edition of INGENIO, our corporate magazine