The multipurpose Rio Verde project took place in the Rio Verde district, in the Esmeraldas province, in northern Ecuador. It covered the pre-feasibility, feasibility and final design phases.

The aim of this project was: to supply drinking water to the main urban centres of the district, to provide water to irrigate 7,300 hectares of land and to control and minimise the effect of floods in Chumundé, Rioverde, Montalvo and Lagarto.

In order to achieve these goals, the following structures were designed:

  • The Chumundé Dam: Type: homogeneous. Height: 33.7 metres. Control volume: 29.63 Hm
  • The Meribe Dam: Type: embankment (overflow) Height: 13 metres. Control volume: 6.47 Hm 3.
  • Catchments: each one has a diversion dam (3 m in height), a channel (25 m in length), a storage reservoir (average volume 75,000 m³ and a surface area of 25,000 m²) and a pumping station (flow rate of up to 1.08 m³/s, manometric pump head of 72.5 metres and a power of 1023 kW). Six catchments were installed in the Rioverde River basin.
  • Electrical substations: due to the increase in the power demand by the pumping system, it was necessary to expand the only station in the area to 3 MVA and build a new one with a power capacity of 5 MVA. 
  • Riverbank protection: the full length of the defences (rock-fill) and river channelling for protection against floods was 6,100 meters.
Location
Ecuador

News

Ayesa participates in Bogotá’s most important environmental project to date to clean its river
28/06/2019

Ayesa participates in Bogotá’s most important environmental project to date to clean its river

Ayesa in 2018: 1.5% growth, 274 million euros in revenue and 24 million euros in EBITDA
13/05/2019

Ayesa in 2018: 1.5% growth, 274 million euros in revenue and 24 million euros in EBITDA

New edition of INGENIO, our corporate magazine
15/03/2019

New edition of INGENIO, our corporate magazine

Ayesa is steaming ahead in Panamanian waters
02/10/2018

Ayesa is steaming ahead in Panamanian waters

Ayesa is close to completing the third international SAP ISU
11/09/2018

Ayesa is close to completing the third international SAP ISU

Ayesa moves up in the ranking of global engineering companies
13/07/2018

Ayesa moves up in the ranking of global engineering companies