Supervision and contract management of Construction of the Poręba and Zawiercie bypass along national road No. 78 section I - Siewierz - Poręba - Zawiercie (Kromołów) - from km 105 + 836 to km 122 + 500”

Construction of the Poręba and Zawiercie bypass along DK78, divided into two sections:

- Section I: Siewierz - Poręba - Zawiercie (Kromołów) - from km 105 + 836 to km 122 + 500

- Section II: section in the city of Zawiercie (Kromołów - Żerkowice) - from km 122 + 500 to km 130 + 135

This Contract applies to Section I of the 16.664 km bypass, along DK 78 running through Siewierz, Poręba to the Zawierciańska district of Kromołów.

The investment is planned for implementation in the "Design and build" system in the years 2019-2023.

The contractor has 34 months to implement the investment. Each of the two stages, design and implementation, should last no more than 17 months, except that winter periods are included in the time covered by the design, and not works until the works are completed. The contractor will prepare all necessary design studies, all arrangements, permits, permits, decisions necessary to perform the contract, and carry out construction works..

Ayesa is supervising and Managing whole contract from the beggining till the end.

 

 

Total lenght: 16,664 km

Date of signing the contract with the consultant: 26.02.2020.

Date of signing the contract with the Contractor: 23.12.2019.

Commencement of works planned for: May 2021.

Construction period: 23 months (without excluding winter periods)

Completion of works expected for: April 2023.

Gross Contract Value: PLN 414 708 742.10 = 96 220 125,77 EUR

Services

Supervisión 

 


Year
2019

Location
Poland

News

Ayesa to use AI to run and monitor a pilot project involving photovoltaic modules on buildings
28/05/2021

Ayesa to use AI to run and monitor a pilot project involving photovoltaic modules on buildings

Ayesa achieves the best results in its history after experiencing 4.3% growth during a year defined by COVID-19
26/04/2021

Ayesa achieves the best results in its history after experiencing 4.3% growth during a year defined by COVID-19

Ayesa set to end the year of Covid with 4% organic growth in terms of its core business
08/01/2021

Ayesa set to end the year of Covid with 4% organic growth in terms of its core business

Dirección de obra de la nueva estación de Atotxa en San Sebastián
07/12/2020

Dirección de obra de la nueva estación de Atotxa en San Sebastián

Ayesa celebrates its 10th anniversary in Peru with major IT and engineering projects
27/10/2020

Ayesa celebrates its 10th anniversary in Peru with major IT and engineering projects

Ayesa touches down in Portugal, expanding its presence in Europe
23/10/2020

Ayesa touches down in Portugal, expanding its presence in Europe