Roads

Purchanval Expressway

The Uttar Pradesh Expressways Industrial Development Authority has chosen Ayesa to Consultancy Services for acting as Authority's Engineer for Supervision of Purvanchal Expressway Project on EPC basis.

Awarded project package from Sansarpur to Haidariya. The project length is 176 kilometers and the cost is INR5798.16 Cr. The duration is 30 month for construction period and 60 month for maintenance.

The expressway will connect the historic towns of Ghazipur and Azamgarh with the state capital, Lucknow. The total length of the road is 343 km and will connect with Varanasi through a separate link road.

Services

Supervision


Year
2019

Location
India

News

Ayesa will design four stations in the first semi-high speed rail corridor in India
16/04/2019

Ayesa will design four stations in the first semi-high speed rail corridor in India

Ayesa 'takes' the high-speed Basque train to supervise the Bergara link
21/01/2019

Ayesa 'takes' the high-speed Basque train to supervise the Bergara link

Ayesa designs two of the most touristic stations in the Jaipur metro
10/12/2018

Ayesa designs two of the most touristic stations in the Jaipur metro

Ayesa designs the two new metro stations at the King Khaled Airport in Riyadh
12/11/2018

Ayesa designs the two new metro stations at the King Khaled Airport in Riyadh

The supervision of 523 kilometres  of toll motorway in Mexico constitutes a roadway milestone
17/09/2018

The supervision of 523 kilometres of toll motorway in Mexico constitutes a roadway milestone

Ayesa is awarded its third contract to adapt a Spanish port for new LNG logistics services
06/09/2018

Ayesa is awarded its third contract to adapt a Spanish port for new LNG logistics services