Toluca - Atlacomulco Toll Road

The Toluca - Atlacomulco road section is part of the Mexico-Nogales corridor, belonging to the Federal Highway network of the SCT. Ayesa has carried out the legal, technical and financial structuring of the toll road tender.

It is located in its entirety in the State of Mexico, with an approximate length of 53 kilometres, starting at kilometre 7 +650. It is classified as A4, with an average crown width of 50 metres; comprised of two bodies and four lanes of circulation.

The toll road has two parking places, located in parking lot 13 +100 (El Dorado) and 56 +100 (Atlacomulco).

The purpose of the contract consists of:

  • The modernisation of the road section, through the construction of a new toll section, implemented communication systems and ITS. Releasing the section in the Atlacomulco - Toluca direction, since this is part of the Pan-American Highway.
  • Closure of irregular access points that are currently used in inadmissible points.
  • Elimination of payment from the Government of the State of Mexico for the passage of residents on the current toll road
  • Design of new ring-roads in Ixtlahuaca and Atlacomulco.

To carry out these aims, the following works have been undertaken:

  • Preliminary Modernisation Project; eliminating irregular access, design of communications systems and ITS, new structures to close off returns and level crossings, building a new body in the existing dividers.
  • Updating of the Informative Profile of the Toluca - Atlacomulco Highway (IRI, PR, friction coef. Etc)
  • Study of Demand and Capacity levels, to analyse the impact of the action on the expected future demand.
  • Drafting of routine, periodic and operational preservation programmes.
  • Drafting of the Environmental Feasibility Study, analysis of the right of social and legal problematic way.
  • Economic and financial study into the feasibility of the construction of the proposed works, according to expected revenues, and request for subsidies or issuance of new debt, whenever appropriate, drafting of cost-benefit analysis.
  • Legal support in the bidding of a new tender project or in the incorporation of a new private investor to the trusteeship.
Location
Mexico

News

José Luis Manzanares Abásolo, CEO of Ayesa, Engineer of the Year 2019
26/11/2019

José Luis Manzanares Abásolo, CEO of Ayesa, Engineer of the Year 2019

Ayesa to carry out an independent review of the engineering work for the Cuarto Puente bridge
21/11/2019

Ayesa to carry out an independent review of the engineering work for the Cuarto Puente bridge

Ayesa comes top in the VII Awards for the Best Practices  in Sustainable Mobility
02/10/2019

Ayesa comes top in the VII Awards for the Best Practices in Sustainable Mobility

CEO: ‘Andalusia needs a portfolio of major investment projects to compete at an international level’
23/09/2019

CEO: ‘Andalusia needs a portfolio of major investment projects to compete at an international level’

10th Annivesary of Ayesa in India
25/07/2019

10th Annivesary of Ayesa in India

Ifema awards Ayesa the technical assistance contract for its extension project
22/07/2019

Ifema awards Ayesa the technical assistance contract for its extension project