Bergara link supervision

The high-speed railway line will join the three Basque capitals, and is taking care of the building of one of its latest and most complex sections: the Mondragón - Elorrio - Bergara section, also known as the “Bergara link”. There are only 15 km, but it entails a strategic point on this large-scale railway project worth €4.8 billion, and it is here where the three lines connect.

The Bergara link has been divided into three sectors, with Ayesa having being awarded the supervision contract for the building of sector 1.

With 5.1 km, this section includes the building of two one-way tunnels measuring 2.3 km each -Udalaitz East and Udalaitz West-, as well as a two-way tunnel (Kortazar, measuring 1.6 km); the Arantostei viaduct (20 metres) and the Angiozar artificial tunnel (200 metres). The result will be a section with two one-way branches and another two-way branch, whose cost will be €134 million.

Concretely, the contract covers the provision of assistance services for technical support to the Site Manager in the monitoring and control of the correct execution of the works, according to the conditions established in the current Project, in the Contractor's Environmental Management Plan (EMP) and in the applicable regulations. It also includes support in the coordination of safety and health of the works and in the carrying out of expropriation procedures and the drafting of possible modifications to the project.

Detailed scope of work:

Project review and analysis
Geometric, quantitative, and qualitative control
Budgetary Control
Certification of works
Daily monitoring of the work carried out
Writing and issuance of reports to site management, both monthly and specific
Control of the documentation delivered by the contractor
Supervision of work execution processes
Quality control of materials
Control of means intended for execution and auxiliary elements
Preliminary data collection in hidden works
Control of environmental authorisations
Control of implementation
Carrying out of final tests and trials
Control of the protection of newly executed elements
Finishing control
Final tests and trials on the finished elements
Compilation and archiving of generated documentation
Carrying out of tests with our own and external laboratories
Supervision of project modification proposals
Management with various agencies to support the management of work

News

José Luis Manzanares Abásolo, CEO of Ayesa, Engineer of the Year 2019
26/11/2019

José Luis Manzanares Abásolo, CEO of Ayesa, Engineer of the Year 2019

Ayesa to carry out an independent review of the engineering work for the Cuarto Puente bridge
21/11/2019

Ayesa to carry out an independent review of the engineering work for the Cuarto Puente bridge

Ayesa comes top in the VII Awards for the Best Practices  in Sustainable Mobility
02/10/2019

Ayesa comes top in the VII Awards for the Best Practices in Sustainable Mobility

CEO: ‘Andalusia needs a portfolio of major investment projects to compete at an international level’
23/09/2019

CEO: ‘Andalusia needs a portfolio of major investment projects to compete at an international level’

10th Annivesary of Ayesa in India
25/07/2019

10th Annivesary of Ayesa in India

Ifema awards Ayesa the technical assistance contract for its extension project
22/07/2019

Ifema awards Ayesa the technical assistance contract for its extension project