Railways

Grybów - Kamionka Wielka railway line

Modernisation of the Grybów - Kamionka Wielka railway line. The main objective of the works is to increase the railway accessibility of these tourist regions.

Twenty-two level crossings are being built in Grybów, Ptaszkowa, Biała Wyżna and Mszalnica and viaducts will be rebuilt in Grybów, Siołkowa and Kamionka Wielka.

Ayesa's supervision includes the renovation of a steel bridge and the reconstruction of the railway infrastructure.

 

 

Technical parameters of the bridge structure:

  • Total length: 137 metres
  • Extension: 18,860 m + 17,320 m + 34,820 m + 17,320 m + 18,860 m
  • Width:. 96.10 m
Services

Supervision

Consultancy


Year
2017

Location
Poland

News

Ayesa will design four stations in the first semi-high speed rail corridor in India
16/04/2019

Ayesa will design four stations in the first semi-high speed rail corridor in India

Ayesa 'takes' the high-speed Basque train to supervise the Bergara link
21/01/2019

Ayesa 'takes' the high-speed Basque train to supervise the Bergara link

Ayesa designs two of the most touristic stations in the Jaipur metro
10/12/2018

Ayesa designs two of the most touristic stations in the Jaipur metro

Ayesa designs the two new metro stations at the King Khaled Airport in Riyadh
12/11/2018

Ayesa designs the two new metro stations at the King Khaled Airport in Riyadh

The supervision of 523 kilometres  of toll motorway in Mexico constitutes a roadway milestone
17/09/2018

The supervision of 523 kilometres of toll motorway in Mexico constitutes a roadway milestone

Ayesa is awarded its third contract to adapt a Spanish port for new LNG logistics services
06/09/2018

Ayesa is awarded its third contract to adapt a Spanish port for new LNG logistics services