Railways

Grybów - Kamionka Wielka railway line

Modernisation of the Grybów - Kamionka Wielka railway line. The main objective of the works is to increase the railway accessibility of these tourist regions.

Twenty-two level crossings are being built in Grybów, Ptaszkowa, Biała Wyżna and Mszalnica and viaducts will be rebuilt in Grybów, Siołkowa and Kamionka Wielka.

Ayesa's supervision includes the renovation of a steel bridge and the reconstruction of the railway infrastructure.

 

 

Technical parameters of the bridge structure:

  • Total length: 137 metres
  • Extension: 18,860 m + 17,320 m + 34,820 m + 17,320 m + 18,860 m
  • Width:. 96.10 m
Services

Supervision

Consultancy


Year
2017

Location
Poland

News

H2020 Starcell project ends with major advances in kesterite-based thin-film photovoltaic technologies
21/02/2020

H2020 Starcell project ends with major advances in kesterite-based thin-film photovoltaic technologies

José Luis Manzanares Abásolo, CEO de Ayesa, Ingeniero del Año 2019
26/11/2019

José Luis Manzanares Abásolo, CEO de Ayesa, Ingeniero del Año 2019

Ayesa to carry out an independent review of the engineering work for the Cuarto Puente bridge
21/11/2019

Ayesa to carry out an independent review of the engineering work for the Cuarto Puente bridge

Ayesa comes top in the VII Awards for the Best Practices  in Sustainable Mobility
02/10/2019

Ayesa comes top in the VII Awards for the Best Practices in Sustainable Mobility

CEO: ‘Andalusia needs a portfolio of major investment projects to compete at an international level’
23/09/2019

CEO: ‘Andalusia needs a portfolio of major investment projects to compete at an international level’

10th Annivesary of Ayesa in India
25/07/2019

10th Annivesary of Ayesa in India