PLAZA Railway Complex

Three platforms have been implemented on an embankment where the rail terminals and other facilities lie.

It has a central platform on which both tracks are located and there are bundles for loading/unloading, reception track/dispatch/management and parking facilities, as well as the facilities that service them (roads, cargo terminal building and beach for loading/unloading). There are two side platforms, one in the south, where the maintenance workshop facilities are, as well as the comprehensive railway and road routes tracks; and one in the northwest of the property on which a lane and part of a rail road stand.

 

The total length of the tracks is 34 km. 16 tracks are electrified; there are 750 meters in length used for receiving freight trains. There are also 6 loading/unloading tracks, and 5 of those are non-electrified. About 50,000 sleepers have been used for the tracks. We also constructed 8 km of auxiliary roads.

We have also built a beach (for loading and unloading) of 37,000 m², on a gantry of 10,500 m of underground piles and on top of it there is a carrier crane for 40-ton containers.

Finally, we have built 65 km of surface water drainage that will disgorge into an 8 km of transverse collectors and a 3-km-long main sewer built 14 m deep. 

News

José Luis Manzanares Abásolo, CEO of Ayesa, Engineer of the Year 2019
26/11/2019

José Luis Manzanares Abásolo, CEO of Ayesa, Engineer of the Year 2019

Ayesa to carry out an independent review of the engineering work for the Cuarto Puente bridge
21/11/2019

Ayesa to carry out an independent review of the engineering work for the Cuarto Puente bridge

Ayesa comes top in the VII Awards for the Best Practices  in Sustainable Mobility
02/10/2019

Ayesa comes top in the VII Awards for the Best Practices in Sustainable Mobility

CEO: ‘Andalusia needs a portfolio of major investment projects to compete at an international level’
23/09/2019

CEO: ‘Andalusia needs a portfolio of major investment projects to compete at an international level’

10th Annivesary of Ayesa in India
25/07/2019

10th Annivesary of Ayesa in India

Ifema awards Ayesa the technical assistance contract for its extension project
22/07/2019

Ifema awards Ayesa the technical assistance contract for its extension project