Railways

Train laboratory Seneca

Train laboratory Seneca

Railway Auscultation is the process thorough infrastructure defects are detected, tracked and analyzed and its level of importance, to determine the corresponding preventive or corrective actions of maintenance with the objective of maintaining and enhancing the quality, reliability and infrastructure security.

 

As far as possible, auscultations are carried out up to the highest speed limits, usually 10% more than the maximum permitted. In addition to these measurements, other parameters are evaluated such displacements and transverse rotations box-bogie, which provide information on the correct path of curves and straight lines. The values of acceleration and comfort are also analyzed in order to evaluate the overall situation of the line

The project includes the provision, installation and smooth running of all IT systems for auscultation equipment, communications and Data visualization in the auscultator train Seneca and all the systems that support the management and analysis duties performed in the Adif Installations (Laboratory of Auscultation).

All this requires the development of a communications system and data visualization that enables the integration of all train auscultation equipment and IT systems for the handling of the data acquired.

Location
Spain

News

Ayesa comes top in the VII Awards for the Best Practices  in Sustainable Mobility
02/10/2019

Ayesa comes top in the VII Awards for the Best Practices in Sustainable Mobility

CEO: ‘Andalusia needs a portfolio of major investment projects to compete at an international level’
23/09/2019

CEO: ‘Andalusia needs a portfolio of major investment projects to compete at an international level’

10th Annivesary of Ayesa in India
25/07/2019

10th Annivesary of Ayesa in India

Ifema awards Ayesa the technical assistance contract for its extension project
22/07/2019

Ifema awards Ayesa the technical assistance contract for its extension project

Ayesa participates in Bogotá’s most important environmental project to date to clean its river
28/06/2019

Ayesa participates in Bogotá’s most important environmental project to date to clean its river

Ayesa is awarded a 40-million-euro contract to provide technical assistance for India’s first rapid rail corridor
03/06/2019

Ayesa is awarded a 40-million-euro contract to provide technical assistance for India’s first rapid rail corridor