Metros and trams

Line 2 of the Panama Metropolitan Railway

Ayesa undertakes the project management, interface coordination and technical assistance of the second line of the Panama Metropolitan Railway.
The Secretariat of the Panama Metropolitan Railway devised this system as the structuring component of the integrated public transport network of the metropolitan area of ​​the capital. In its first stage, Line 2 will have a length of 21 kilometres of elevated track and will feature 16 stations.
These works have been allocated a budget of 2.062 billion dollars.
This new line will have an initial capacity to transport 16,000 passengers per hour and is designed for an annual capacity of more than 40,000 per hour and travelling direction.

Location
Panama

News

Ayesa comes top in the VII Awards for the Best Practices  in Sustainable Mobility
02/10/2019

Ayesa comes top in the VII Awards for the Best Practices in Sustainable Mobility

CEO: ‘Andalusia needs a portfolio of major investment projects to compete at an international level’
23/09/2019

CEO: ‘Andalusia needs a portfolio of major investment projects to compete at an international level’

10th Annivesary of Ayesa in India
25/07/2019

10th Annivesary of Ayesa in India

Ifema awards Ayesa the technical assistance contract for its extension project
22/07/2019

Ifema awards Ayesa the technical assistance contract for its extension project

Ayesa participates in Bogotá’s most important environmental project to date to clean its river
28/06/2019

Ayesa participates in Bogotá’s most important environmental project to date to clean its river

Ayesa is awarded a 40-million-euro contract to provide technical assistance for India’s first rapid rail corridor
03/06/2019

Ayesa is awarded a 40-million-euro contract to provide technical assistance for India’s first rapid rail corridor