Metros and trams

Line 2 of the Panama Metropolitan Railway

Ayesa undertakes the project management, interface coordination and technical assistance of the second line of the Panama Metropolitan Railway.
The Secretariat of the Panama Metropolitan Railway devised this system as the structuring component of the integrated public transport network of the metropolitan area of ​​the capital. In its first stage, Line 2 will have a length of 21 kilometres of elevated track and will feature 16 stations.
These works have been allocated a budget of 2.062 billion dollars.
This new line will have an initial capacity to transport 16,000 passengers per hour and is designed for an annual capacity of more than 40,000 per hour and travelling direction.

Location
Panama

News

The Chairman of Ayesa asks the Spanish Government to take steps to ensure the engineering industry remains the country’s powerhouse
18/06/2020

The Chairman of Ayesa asks the Spanish Government to take steps to ensure the engineering industry remains the country’s powerhouse

H2020 Starcell project ends with major advances in kesterite-based thin-film photovoltaic technologies
21/02/2020

H2020 Starcell project ends with major advances in kesterite-based thin-film photovoltaic technologies

José Luis Manzanares Abásolo, CEO de Ayesa, Ingeniero del Año 2019
26/11/2019

José Luis Manzanares Abásolo, CEO de Ayesa, Ingeniero del Año 2019

Ayesa to carry out an independent review of the engineering work for the Cuarto Puente bridge
21/11/2019

Ayesa to carry out an independent review of the engineering work for the Cuarto Puente bridge

Ayesa comes top in the VII Awards for the Best Practices  in Sustainable Mobility
02/10/2019

Ayesa comes top in the VII Awards for the Best Practices in Sustainable Mobility

CEO: ‘Andalusia needs a portfolio of major investment projects to compete at an international level’
23/09/2019

CEO: ‘Andalusia needs a portfolio of major investment projects to compete at an international level’