The new bridge over the Guadaíra River called The Keeper of the Castle is the first figurative bridge in the world. Its unique design, signed by Jose Luis Manzanares Japón, led him to win the Ideas Competition organized by the Public Enterprise Infrastructure of Andalusia, Giasa, held at the City Hall of Alcala de Guadaira, in Seville.

The length of the bridge is 123.50 m, distributed into four bays, with 18.50 m on the side and a center of 43 m. Structurally, it features a panel of 22,60 m in width, rigidly connected at its central axis (except in the area on pillars) with two circular arcs of 28 m radius in the two central bays, and two arcs of the same radio on the sides.

 

The bridge is part of a section located in the Municipality of Alcala de Guadaira, with an approximate length of 2,900 m.  It is the continuation of the Zacatín Roads that collects traffic from the A-92 from the SE-410 to Highway A-392 (Alcalá de Guadaira “Two Sisters”).

From the standpoint of quality control and innovation in materials, The Keeper of the Castle Bridge was the first bridge built in Spain with self-compacting structural concrete (Hormigón Autocompactante HAC). During the construction of the bridge the HAC was in the pre-approval stage in Spain. Therefore, our technicians were actively involved in this project. The experience acquired has been the subject of numerous technical publications and lectures at Universities and Technology Centers nationwide. 

Location
Spain

News

10th Annivesary of Ayesa in India
25/07/2019

10th Annivesary of Ayesa in India

Ifema awards Ayesa the technical assistance contract for its extension project
22/07/2019

Ifema awards Ayesa the technical assistance contract for its extension project

Ayesa participates in Bogotá’s most important environmental project to date to clean its river
28/06/2019

Ayesa participates in Bogotá’s most important environmental project to date to clean its river

Ayesa is awarded a 40-million-euro contract to provide technical assistance for India’s first rapid rail corridor
03/06/2019

Ayesa is awarded a 40-million-euro contract to provide technical assistance for India’s first rapid rail corridor

Ayesa will design four stations in the first semi-high speed rail corridor in India
16/04/2019

Ayesa will design four stations in the first semi-high speed rail corridor in India

Ayesa 'takes' the high-speed Basque train to supervise the Bergara link
21/01/2019

Ayesa 'takes' the high-speed Basque train to supervise the Bergara link