Pharmaceutical engineering

API multipurpose plant, MEDICHEM

Ayesa has carried out the works on the plant using the turn-key method, including:

  • Basic Engineering.
  • Detailed engineering.
  • Procurement management.
  • Legalisation of projects.
  • Supplies
  • Service Start-up.

All the foregoing has meant a total of 35,000 hours of engineering.

The project of the new APImultipurpose plant included:

  • Synthesis and separation area.
  • Pilot plant.
  • Physical treatments.
  • Storage of intermediate products and final product.
  • Storage of solvents and raw materials.
  • Treatment of waste water and solvents.
  • Buildings for laboratory and offices.
Location
Malt

News

Ayesa comes top in the VII Awards for the Best Practices  in Sustainable Mobility
02/10/2019

Ayesa comes top in the VII Awards for the Best Practices in Sustainable Mobility

CEO: ‘Andalusia needs a portfolio of major investment projects to compete at an international level’
23/09/2019

CEO: ‘Andalusia needs a portfolio of major investment projects to compete at an international level’

Ayesa in 2018: 1.5% growth, 274 million euros in revenue and 24 million euros in EBITDA
13/05/2019

Ayesa in 2018: 1.5% growth, 274 million euros in revenue and 24 million euros in EBITDA

New edition of INGENIO, our corporate magazine
15/03/2019

New edition of INGENIO, our corporate magazine

“Industry must be bolstered in 4.0 environments to tackle the disruptive changes in the offing”
03/01/2019

“Industry must be bolstered in 4.0 environments to tackle the disruptive changes in the offing”

EQO contracts Ayesa to transform its chlorine plant
30/10/2018

EQO contracts Ayesa to transform its chlorine plant