The project focused on the refurbishment of the olefins plant with the aim of increasing production rates by 7%.
The contract covered:
- Modification of existing equipment.
- Installation of new equipment.
- New instrumentation and modification of existing instruments.
- Expansion of the electric sub-station.
- Expansion and migration of PLC security.
- Review of the fire protection system.
Scope activities:
- Detailed engineering
- Purchase management (equipment and materials).