Industrial systems

Santa Clara dairy plant in Jalisco

Development of basic and detailed engineering for a milk processing plant and other dairy products.

Located in Lagos de Moreno (Jalisco), the works include four production lines. The space is spread over 55 hectares.

The following areas are covered:

  • Unloading bay.
  • Auxiliary Services.
  • Cold-storage room
  • Administrative and Production Offices.
  • Access and Parking Facilities

Complementary Services:

  • Architecture
  • Earthworks and Roadways.
  • Structures and foundations
  • Electrical Engineering
  • Plumbing Engineering
  • HVAC Engineering and ventilation
  • Security engineering CCTV, telephony and data
  • Industrial communications network engineering

News

José Luis Manzanares Abásolo, CEO of Ayesa, Engineer of the Year 2019
26/11/2019

José Luis Manzanares Abásolo, CEO of Ayesa, Engineer of the Year 2019

Ayesa comes top in the VII Awards for the Best Practices  in Sustainable Mobility
02/10/2019

Ayesa comes top in the VII Awards for the Best Practices in Sustainable Mobility

CEO: ‘Andalusia needs a portfolio of major investment projects to compete at an international level’
23/09/2019

CEO: ‘Andalusia needs a portfolio of major investment projects to compete at an international level’

Ayesa in 2018: 1.5% growth, 274 million euros in revenue and 24 million euros in EBITDA
13/05/2019

Ayesa in 2018: 1.5% growth, 274 million euros in revenue and 24 million euros in EBITDA

New edition of INGENIO, our corporate magazine
15/03/2019

New edition of INGENIO, our corporate magazine

“Industry must be bolstered in 4.0 environments to tackle the disruptive changes in the offing”
03/01/2019

“Industry must be bolstered in 4.0 environments to tackle the disruptive changes in the offing”