Industrial systems

GRI Offshore wind turbine factory

Engineering services and construction management for the new offshore tower factory in the Port of Seville.

The GRI Renewable Industries project includes the construction of new buildings and the recovery of buildings from old shipyards in Seville, to incorporate them and adapt them to the process of manufacturing marine wind towers.


The factory has been sized for a production rate of 110 towers per annum. These are sizeable objects: reaching a weight of 440 tons, a length of 150 metres and a diameter of 10 metres.
In total, the complex exceeds more than 50,000 square meters in production facilities.

Ayesa has worked in tandem with the client throughout the process, from the basic project to its final implementation, covering:

  • Drafting of basic project and construction of all elements.
  • Management of construction and environmental licences granted by the different local and regional administrations.
  • Assistance during bidding and contracting for construction works.
  • Project and construction management.
  • Occupational health and safety coordination.


The scope was extended, adding the subsequent supervision of the works and the Technical Management of the Project.

Year
2017

Location
Spain

News

Ayesa comes top in the VII Awards for the Best Practices  in Sustainable Mobility
02/10/2019

Ayesa comes top in the VII Awards for the Best Practices in Sustainable Mobility

CEO: ‘Andalusia needs a portfolio of major investment projects to compete at an international level’
23/09/2019

CEO: ‘Andalusia needs a portfolio of major investment projects to compete at an international level’

Ayesa in 2018: 1.5% growth, 274 million euros in revenue and 24 million euros in EBITDA
13/05/2019

Ayesa in 2018: 1.5% growth, 274 million euros in revenue and 24 million euros in EBITDA

New edition of INGENIO, our corporate magazine
15/03/2019

New edition of INGENIO, our corporate magazine

“Industry must be bolstered in 4.0 environments to tackle the disruptive changes in the offing”
03/01/2019

“Industry must be bolstered in 4.0 environments to tackle the disruptive changes in the offing”

EQO contracts Ayesa to transform its chlorine plant
30/10/2018

EQO contracts Ayesa to transform its chlorine plant