Basic engineering project of two wind farms whose scope is mainly electromechanical and civil (transmission lines, electrical substations, medium voltage network, roads, wind turbine foundations, foundations of major and minor substation equipment).

The purpose of the basic engineering of each wind farm named La Carabina I (200MW) and II (150 MW) is to define, typify and establish the minimum guidelines that must be fulfilled.

 

Activities carried out:

  • General and geographical location.
  • Planimetry of internal roads.
  • Typical sections of internal roads.
  • Sections of internal roads and confirmation of road planimetry.
  • Wind turbine platforms.
  • Drainage systems.
  • Basic substation engineering of PEC I and PEC II.
  • Basic engineering of convergence substation and transition to transmission line.
  • Preliminary of wind turbine foundations.
  • Medium voltage network.
  • Single-line park layout diagrams
  • Simplified park layout diagrams.
  • Basic specifications of all transformers.
  • Voltage line running 80 kilometres.
Services

Ingeniería


Location
Mexico

News

New edition of INGENIO, our corporate magazine
15/03/2019

New edition of INGENIO, our corporate magazine

“Industry must be bolstered in 4.0 environments to tackle the disruptive changes in the offing”
03/01/2019

“Industry must be bolstered in 4.0 environments to tackle the disruptive changes in the offing”

EQO contracts Ayesa to transform its chlorine plant
30/10/2018

EQO contracts Ayesa to transform its chlorine plant

Ayesa is awarded its third contract to adapt a Spanish port for new LNG logistics services
06/09/2018

Ayesa is awarded its third contract to adapt a Spanish port for new LNG logistics services

Spanish engineering for Japanese nylon
29/08/2018

Spanish engineering for Japanese nylon

Ayesa moves up in the ranking of global engineering companies
13/07/2018

Ayesa moves up in the ranking of global engineering companies