Simple Circuit AT airline project with 2 conductors per phase, to connect the Dominica wind farm substation with 200MW generation capacity, with the transport network in Charcas Substation (CFE). The line has a length of 39 km. The line is designed and calculated according to the requirements and specifications set forth by CFE.

Features:

  • Nominal Voltage: 115kV, 60Hz
  • LAT driver: ACSR / AS 1113
  • OPGW AlumaCore Optical Ground Wire with 12 fibres (12 fibres G.652)
  • Number of towers: 147
  • Lattice metal structure towers
Services

EPC


Year
En curso

Location
Peru

News

Ayesa comes top in the VII Awards for the Best Practices  in Sustainable Mobility
02/10/2019

Ayesa comes top in the VII Awards for the Best Practices in Sustainable Mobility

CEO: ‘Andalusia needs a portfolio of major investment projects to compete at an international level’
23/09/2019

CEO: ‘Andalusia needs a portfolio of major investment projects to compete at an international level’

Ayesa in 2018: 1.5% growth, 274 million euros in revenue and 24 million euros in EBITDA
13/05/2019

Ayesa in 2018: 1.5% growth, 274 million euros in revenue and 24 million euros in EBITDA

New edition of INGENIO, our corporate magazine
15/03/2019

New edition of INGENIO, our corporate magazine

“Industry must be bolstered in 4.0 environments to tackle the disruptive changes in the offing”
03/01/2019

“Industry must be bolstered in 4.0 environments to tackle the disruptive changes in the offing”

EQO contracts Ayesa to transform its chlorine plant
30/10/2018

EQO contracts Ayesa to transform its chlorine plant