Singular Buildings

Amador Convention Center

The new Amador Convention, Exhibition and Event Center proposes a space dedicated to large international events of fairs, congresses and exhibitions in Panama City, with modern facilities to accommodate large national and international events. 

Ayesa's Project Management work is carried out in two main stages:

 - Phase I. Design and Construction:

Includes the services related to supervision, inspection and control of Project execution throughout the design, equipment and construction phases, performing integral administration functions and technical advice for the ATP (Panama Tourism Authority) to plan , develop, coordinate, follow up, inspect, control and monitor the work and activities carried out by the project construction company.

 - Phase II. Technology Transfer:

Once the works are completed, Ayesa will transfer the technology with technical assistance to the ATP during the start-up of the new Convention Center, managing the operating manuals. At the same time, ATP is assisted in hiring the administrator of the New Convention Center, supporting its work during the development of our contract.

Scope of work: 

- Management of the assignment of the design-build contract between consortia
- Value engineering for conceptual design
- Supervision of the construction design verifying compliance with local regulations
- Management and supervision of the building's BIM model
- Control, monitoring and supervision of works (quality, geometric control, reception of materials and execution of work, safety and environmental management).
- Change management and project configuration, with the necessary legal advice.
- Management of the work schedule, with fortnightly control of the progress of the work
- Cost management, with control over the progress of work certifications and supported by the BIM development of the project.
- Specialised advice on exploitation, bidding for the international tender for the management and exploitation of the centre.
- Commissioning of the building's installations and accompaniment of the operator at the start of its operations.

 

Services

Project management


Year
2016-2020

Location
Panama

News

Ayesa is set to expand its backlog in urban transport thanks to a new project involving the Santiago Metro in Chile
28/09/2021

Ayesa is set to expand its backlog in urban transport thanks to a new project involving the Santiago Metro in Chile

Ayesa to use AI to run and monitor a pilot project involving photovoltaic modules on buildings
28/05/2021

Ayesa to use AI to run and monitor a pilot project involving photovoltaic modules on buildings

Ayesa achieves the best results in its history after experiencing 4.3% growth during a year defined by COVID-19
26/04/2021

Ayesa achieves the best results in its history after experiencing 4.3% growth during a year defined by COVID-19

Ayesa set to end the year of Covid with 4% organic growth in terms of its core business
08/01/2021

Ayesa set to end the year of Covid with 4% organic growth in terms of its core business

Dirección de obra de la nueva estación de Atotxa en San Sebastián
07/12/2020

Dirección de obra de la nueva estación de Atotxa en San Sebastián

Ayesa celebrates its 10th anniversary in Peru with major IT and engineering projects
27/10/2020

Ayesa celebrates its 10th anniversary in Peru with major IT and engineering projects