Singular Buildings

Project for completion of Ayesa corporate building

Electromechanical facilities in the building comprising:


•    Transformer substation: 800 kVA
•    Low Voltage: electrical panels, lighting, ducting system and wiring
•    Air conditioning and ventilation, three chillers with 604.8 kW, 478 kW and 160 kW cooling capacity, booster pumps, fancoils and control items
•    Voice - Data Installation: ducting system, wiring and electronic network 
•    Firefighting Protection System: pressure system, fire standpipes, extinguishers, detection and signs
•    Public address: Central PA System, distribution and 132 recessed speakers
•    Plumbing
•    Sanitation
•    Lifts: two lifts and hoists
•    Regulation and Control System
•    Data Processing Centre
•    Security, CCTV and intrusion control

Location
Spain

News

Ayesa is set to expand its backlog in urban transport thanks to a new project involving the Santiago Metro in Chile
28/09/2021

Ayesa is set to expand its backlog in urban transport thanks to a new project involving the Santiago Metro in Chile

Ayesa to use AI to run and monitor a pilot project involving photovoltaic modules on buildings
28/05/2021

Ayesa to use AI to run and monitor a pilot project involving photovoltaic modules on buildings

Ayesa achieves the best results in its history after experiencing 4.3% growth during a year defined by COVID-19
26/04/2021

Ayesa achieves the best results in its history after experiencing 4.3% growth during a year defined by COVID-19

Ayesa set to end the year of Covid with 4% organic growth in terms of its core business
08/01/2021

Ayesa set to end the year of Covid with 4% organic growth in terms of its core business

Dirección de obra de la nueva estación de Atotxa en San Sebastián
07/12/2020

Dirección de obra de la nueva estación de Atotxa en San Sebastián

Ayesa celebrates its 10th anniversary in Peru with major IT and engineering projects
27/10/2020

Ayesa celebrates its 10th anniversary in Peru with major IT and engineering projects