Singular Buildings

Project for completion of Ayesa corporate building

Electromechanical facilities in the building comprising:


•    Transformer substation: 800 kVA
•    Low Voltage: electrical panels, lighting, ducting system and wiring
•    Air conditioning and ventilation, three chillers with 604.8 kW, 478 kW and 160 kW cooling capacity, booster pumps, fancoils and control items
•    Voice - Data Installation: ducting system, wiring and electronic network 
•    Firefighting Protection System: pressure system, fire standpipes, extinguishers, detection and signs
•    Public address: Central PA System, distribution and 132 recessed speakers
•    Plumbing
•    Sanitation
•    Lifts: two lifts and hoists
•    Regulation and Control System
•    Data Processing Centre
•    Security, CCTV and intrusion control

Location
Spain

News

10th Annivesary of Ayesa in India
25/07/2019

10th Annivesary of Ayesa in India

Ifema awards Ayesa the technical assistance contract for its extension project
22/07/2019

Ifema awards Ayesa the technical assistance contract for its extension project

Ayesa participates in Bogotá’s most important environmental project to date to clean its river
28/06/2019

Ayesa participates in Bogotá’s most important environmental project to date to clean its river

Ayesa is awarded a 40-million-euro contract to provide technical assistance for India’s first rapid rail corridor
03/06/2019

Ayesa is awarded a 40-million-euro contract to provide technical assistance for India’s first rapid rail corridor

Ayesa will design four stations in the first semi-high speed rail corridor in India
16/04/2019

Ayesa will design four stations in the first semi-high speed rail corridor in India

Ayesa 'takes' the high-speed Basque train to supervise the Bergara link
21/01/2019

Ayesa 'takes' the high-speed Basque train to supervise the Bergara link