Singular Buildings

Project for completion of Ayesa corporate building

Electromechanical facilities in the building comprising:


•    Transformer substation: 800 kVA
•    Low Voltage: electrical panels, lighting, ducting system and wiring
•    Air conditioning and ventilation, three chillers with 604.8 kW, 478 kW and 160 kW cooling capacity, booster pumps, fancoils and control items
•    Voice - Data Installation: ducting system, wiring and electronic network 
•    Firefighting Protection System: pressure system, fire standpipes, extinguishers, detection and signs
•    Public address: Central PA System, distribution and 132 recessed speakers
•    Plumbing
•    Sanitation
•    Lifts: two lifts and hoists
•    Regulation and Control System
•    Data Processing Centre
•    Security, CCTV and intrusion control

Location
Spain

News

H2020 Starcell project ends with major advances in kesterite-based thin-film photovoltaic technologies
21/02/2020

H2020 Starcell project ends with major advances in kesterite-based thin-film photovoltaic technologies

José Luis Manzanares Abásolo, CEO de Ayesa, Ingeniero del Año 2019
26/11/2019

José Luis Manzanares Abásolo, CEO de Ayesa, Ingeniero del Año 2019

Ayesa to carry out an independent review of the engineering work for the Cuarto Puente bridge
21/11/2019

Ayesa to carry out an independent review of the engineering work for the Cuarto Puente bridge

Ayesa comes top in the VII Awards for the Best Practices  in Sustainable Mobility
02/10/2019

Ayesa comes top in the VII Awards for the Best Practices in Sustainable Mobility

CEO: ‘Andalusia needs a portfolio of major investment projects to compete at an international level’
23/09/2019

CEO: ‘Andalusia needs a portfolio of major investment projects to compete at an international level’

10th Annivesary of Ayesa in India
25/07/2019

10th Annivesary of Ayesa in India