Project for completion of Ayesa corporate building

Electromechanical facilities in the building comprising:


•    Transformer substation: 800 kVA
•    Low Voltage: electrical panels, lighting, ducting system and wiring
•    Air conditioning and ventilation, three chillers with 604.8 kW, 478 kW and 160 kW cooling capacity, booster pumps, fancoils and control items
•    Voice - Data Installation: ducting system, wiring and electronic network 
•    Firefighting Protection System: pressure system, fire standpipes, extinguishers, detection and signs
•    Public address: Central PA System, distribution and 132 recessed speakers
•    Plumbing
•    Sanitation
•    Lifts: two lifts and hoists
•    Regulation and Control System
•    Data Processing Centre
•    Security, CCTV and intrusion control

Location
Spain

News

Ayesa will design four stations in the first semi-high speed rail corridor in India
16/04/2019

Ayesa will design four stations in the first semi-high speed rail corridor in India

Ayesa 'takes' the high-speed Basque train to supervise the Bergara link
21/01/2019

Ayesa 'takes' the high-speed Basque train to supervise the Bergara link

Ayesa designs two of the most touristic stations in the Jaipur metro
10/12/2018

Ayesa designs two of the most touristic stations in the Jaipur metro

Ayesa designs the two new metro stations at the King Khaled Airport in Riyadh
12/11/2018

Ayesa designs the two new metro stations at the King Khaled Airport in Riyadh

The supervision of 523 kilometres  of toll motorway in Mexico constitutes a roadway milestone
17/09/2018

The supervision of 523 kilometres of toll motorway in Mexico constitutes a roadway milestone

Ayesa is awarded its third contract to adapt a Spanish port for new LNG logistics services
06/09/2018

Ayesa is awarded its third contract to adapt a Spanish port for new LNG logistics services