Stations

Line 8 of the Delhi Metro

Ayesa was responsible for designing 26 above-ground and underground stations on the Delhi Metro, as part of Phase III of the corridor between Janakpuri (east) and the Botanical Garden. This project formed part of the design and detail consulting contract for civil engineering works, architecture and installations for this infrastructure.

In terms of the design, the operating of the facilities, passenger traffic and the integration of the stations in their surroundings were all taken into account.

Location
India

News

Ayesa strengthens its position in the roads sector in Poland in the middle of the pandemic with its biggest contract to date in the country
28/07/2020

Ayesa strengthens its position in the roads sector in Poland in the middle of the pandemic with its biggest contract to date in the country

The Chairman of Ayesa asks the Spanish Government to take steps to ensure the engineering industry remains the country’s powerhouse
18/06/2020

The Chairman of Ayesa asks the Spanish Government to take steps to ensure the engineering industry remains the country’s powerhouse

H2020 Starcell project ends with major advances in kesterite-based thin-film photovoltaic technologies
21/02/2020

H2020 Starcell project ends with major advances in kesterite-based thin-film photovoltaic technologies

José Luis Manzanares Abásolo, CEO de Ayesa, Ingeniero del Año 2019
26/11/2019

José Luis Manzanares Abásolo, CEO de Ayesa, Ingeniero del Año 2019

Ayesa to carry out an independent review of the engineering work for the Cuarto Puente bridge
21/11/2019

Ayesa to carry out an independent review of the engineering work for the Cuarto Puente bridge

Ayesa comes top in the VII Awards for the Best Practices  in Sustainable Mobility
02/10/2019

Ayesa comes top in the VII Awards for the Best Practices in Sustainable Mobility