Stadiums

Project management of the interventions aimed at improving sport infrastructures for the 2013 Bolivarian Games Trujillo

Project Management for the supervision of the interventions aimed at improving the sport infrastructures for the 2013 Bolivarian Games Trujillo, which will take place mainly in Trujillo, with some events being celebrated in Chiclayo and Lima. Since June 2012, Ayesa has been developing said functions to build the new sports facilities detailed below, classified by location:

Special characteristics:

Trujillo:

• Chicago Sports Complex (Athletics Track, Sports
Centre, Coliseum and Gym)
• Gildemeister training pool.
• Mansiche swimming pool.
• Huanchaco swimming pool.
• Boquerón Stadium
• Playa Sports Centre

Lima
• National Sports Villa VIDENA (Sports Centre 1 and 2,
Residence Hall and Velodrome)
• Huiracocha BMX Centre

Chiclayo
• Elías Aguirre Sports Complex (Stadium, Sports
Centre, Coliseum, Aquatic Centre and High
Performance Centre)

Location
Peru

News

Ayesa strengthens its position in the roads sector in Poland in the middle of the pandemic with its biggest contract to date in the country
28/07/2020

Ayesa strengthens its position in the roads sector in Poland in the middle of the pandemic with its biggest contract to date in the country

The Chairman of Ayesa asks the Spanish Government to take steps to ensure the engineering industry remains the country’s powerhouse
18/06/2020

The Chairman of Ayesa asks the Spanish Government to take steps to ensure the engineering industry remains the country’s powerhouse

H2020 Starcell project ends with major advances in kesterite-based thin-film photovoltaic technologies
21/02/2020

H2020 Starcell project ends with major advances in kesterite-based thin-film photovoltaic technologies

José Luis Manzanares Abásolo, CEO de Ayesa, Ingeniero del Año 2019
26/11/2019

José Luis Manzanares Abásolo, CEO de Ayesa, Ingeniero del Año 2019

Ayesa to carry out an independent review of the engineering work for the Cuarto Puente bridge
21/11/2019

Ayesa to carry out an independent review of the engineering work for the Cuarto Puente bridge

Ayesa comes top in the VII Awards for the Best Practices  in Sustainable Mobility
02/10/2019

Ayesa comes top in the VII Awards for the Best Practices in Sustainable Mobility